Two fit-out quotations for the same villa can differ widely, and the total alone rarely tells you why. What matters is what each line covers, what has been left out and how changes will be priced once works begin. This guide explains how to read a quotation, and how we build ours.

Send your brief on WhatsApp

Updated

DI&ME showroom: dark oak kitchen, glass wardrobe and textile walls

Start with the scope, not the total

A quotation is only as good as the scope it prices. Before comparing figures, check that every bidder has priced the same drawings, the same finish schedule and the same list of rooms. If one contractor has assumed a developer-standard kitchen and another has priced bespoke joinery, the totals are not comparable.

Look for a written scope of works attached to the quotation, with drawing references and revision numbers. A quotation that refers only to “interior works as discussed” leaves too much open to interpretation later.

Lump sum or itemised estimate

A lump sum gives one figure for the whole job, sometimes split into a few broad headings such as civil works, joinery and MEP. It is simple to read, but you cannot see how much is material, how much is labour and how much is margin, and you cannot easily remove or change one item.

An itemised estimate prices the work line by line: each wall finish, each joinery unit, each light fitting, each stone surface, with quantities and unit rates. It takes longer to read, but it lets you see where the money goes, compare like with like and make informed decisions about where to spend.

For a small, well-defined job a lump sum can be perfectly reasonable. For a villa or residence with bespoke joinery, stone and furniture, an itemised estimate is far easier to manage over the life of the project.

Where hidden costs usually sit

The most common gaps are provisional sums and exclusions. A provisional sum is an allowance for something not yet designed or selected, such as sanitaryware or lighting. If the allowance is low, the quotation looks attractive and the real figure arrives later.

Exclusions are just as important. Read them carefully: approvals and developer fees, protection of existing finishes, waste removal, temporary power and water, MEP modifications, and making good after other trades are often listed as excluded, or simply not mentioned. Ask for each one to be either priced or clearly stated as your responsibility.

Finally, check what the quotation assumes about the existing building. Works behind walls and above ceilings are rarely visible at quotation stage, which is why a proper site survey, and opening up where needed, matters before the figure is fixed.

Options per item

A good estimate does not only tell you the price; it shows you choices. For major items such as stone, flooring, joinery finishes or furniture, two or three options at different levels let you decide where a premium material is worth it and where a simpler one will do.

Options work best when they are priced on the same quantities and shown side by side. That way the difference between, for example, a natural stone and an engineered surface is a clear figure rather than a guess.

Variations and how they are priced

Almost every interior project changes once works are under way. You may move a socket, upgrade a fitting or add a joinery unit. These changes are variations, and the way they are priced decides whether a budget holds.

Ask before you sign how variations will be valued. The clearest approach uses the unit rates already in the itemised estimate, so a change is priced on the same basis as the original work. Each variation should be written, priced and approved by you before it is carried out, with its effect on the programme stated.

Be cautious with quotations that give no rates at all. Without them, every variation becomes a fresh negotiation, usually at a moment when you have little leverage.

Payment stages and the programme

A quotation should also say when you pay and for what. Payments are clearest when they are tied to visible stages, such as approval of drawings, ordering of long-lead materials, completion of first-fix works and handover, rather than to dates on a calendar.

Check that the payment schedule matches the programme. If large sums fall due before the related materials are ordered or the related works are done, ask why. A schedule that follows progress protects both sides and keeps the project moving.

When comparing two quotations side by side, put them into the same structure: the same rooms, the same trades and the same exclusions. The differences that remain are the ones worth discussing.

How DI&ME’s transparent pricing works

Our estimates are itemised line by line. Materials, works and our fee are shown separately, and the full estimate is agreed with you before works start. You can see what each element costs and what we charge for managing and delivering it.

Where the design allows, we offer two or three options for an item, so you can balance the budget room by room. Procurement draws on a network of more than 500 manufacturers and distributors, and joinery, furniture and wall panels are priced from our own production in Dubai Investments Park.

Variations are priced from the same estimate and approved in writing before they go ahead. Custom projects start from AED 100,000, and the actual figure for your property comes after the site survey, together with a dated programme.

Questions owners ask us

Why do fit-out quotations in Dubai vary so much?

Usually because bidders have priced different scopes, different finish levels or different assumptions about the existing building. Comparing itemised estimates against the same drawings removes most of the difference.

What is a provisional sum?

An allowance for an item that has not yet been designed or selected. It is useful early on, but check that each allowance is realistic, because the final cost replaces it.

Should approvals be included in the quotation?

They should at least be addressed. Either the contractor prepares and submits the documents as part of the scope, or the quotation states clearly that approvals are excluded. We usually include preparing and submitting them.

Can I remove items from an itemised estimate?

Yes. That is one of its advantages: you can remove, simplify or upgrade a line and see the effect on the total straight away, before anything is ordered.

When is the final price fixed?

After the site survey, once the scope and finishes are agreed. We then issue the itemised estimate and a dated programme, and works start only once you have approved both.

Start a project

Tell us about your home

Send your plans or a few photos on WhatsApp. We reply with next steps and a time for a site visit. Custom projects start from AED 100,000.